The bathroom project is nearly complete. Our first floor lavatory consisted of a linen closet, basin and commode. With Robyn having to struggle to use the 2nd Floor bathroom tub/shower, we decided to re-vamp the first floor lav. We removed the linen closet, moved the basin and installed a tall commode, and a handicap friendly tile shower. There's a timer operated heat-lite and exhaust fan, and the shower has an adjustable shower head height, safety grab bars, handicap chair and a hand wand. The bathroom is functional, with only some drywall and painting needed to put on the finishing touches.
No comments:
Post a Comment