Saturday, July 24, 2010

Love that Shower


The bathroom project is nearly complete. Our first floor lavatory consisted of a linen closet, basin and commode. With Robyn having to struggle to use the 2nd Floor bathroom tub/shower, we decided to re-vamp the first floor lav. We removed the linen closet, moved the basin and installed a tall commode, and a handicap friendly tile shower. There's a timer operated heat-lite and exhaust fan, and the shower has an adjustable shower head height, safety grab bars, handicap chair and a hand wand.  The bathroom is functional, with only some drywall and painting needed to put on the finishing touches.

No comments: